The RoomData™ guided walkthrough has images and narration of the tool to provide a high level experience of its use.

click here to start the tour

Walkthrough

How Does It Work? The Process At Work
Introduction Project Initiation
Why Roomdata™? Briefing
Reports Design/Documentation
Guided Walkthrough Construction
Training Commissioning/Bar-coding
Bar-coding
Security/Technical Requirements
Construction

Process/Actions

  • Alterations to project data occurs as the design is changed by design team.
  • Construction proceeds. Items managed by trade suppliers on-line.
  • Databases are updated to match 'as built'.
  • Specific supplier information is entered.
  • Actual Room Data Sheets 'as built' generated.
  • Print actual Room Data Sheets
  • Print FF&E (group 2 & 3) items for purchase. tailored reports by supplier, lead-time, etc..
  • Furniture and Equipment Purchasing
  • Additional FF&E custom attributes filled in (supplier, final price, warranty, product code etc..)
  • Ability for suppliers to enter bar code no's and other detail into database at time of, or before delivery.
  • Procurement consultants or Project Owner adjusts generic FF&E items for project.
  • All associated attributes captured, including supplier, colour, model, warranty details, barcode, etc..
  • Actual FF&E Tender & Procurement schedules
  • Actual FF&E listings & budgets by room, Dept., level, project.
  • Ability to extract data for use in a Facility Maintenance software system
  • Archive project, but save individual user libraries for later use.

Benefit:

Currently, Procurement is being completed largely manually, and 're-invented' project to project.

RoomData™ provides complete co-ordination between design team & FF&E procurement staff via a single on-line database.

Independent control of FF&E items and budget.